瀝青混凝土斜坡流淌值試驗(yàn)儀檢測(cè)儀器,用于測(cè)定瀝青混凝土斜坡流淌值。適用于骨料A 大粒徑不大于26.5mm室內(nèi)成型的試件和現(xiàn)場(chǎng)鉆取的芯樣。使用前務(wù)必仔細(xì)閱讀說(shuō)明書。并由 實(shí)驗(yàn)人員操作,以避免操作不當(dāng)引起的傷害。如需了解更多資料請(qǐng)與我公司客服人員聯(lián)系。
Asphalt concrete slope flow value tester is a testing instrument for determining asphalt concrete slope flow value. It is applicable to the test pieces for indoor molding of aggregate A with a large particle size not larger than 26.5mm and core samples drilled on site. Be sure to read the instructions carefully before use. It is operated by experimental personnel to avoid injury caused by improper operation. For more information, please contact our customer service staff.
瀝青混凝土斜坡流淌值試驗(yàn)儀符合DL/T5362-2006水工瀝青混凝土試驗(yàn)規(guī)程。由上海榮計(jì)達(dá)儀器科技有限公司提供,設(shè)備質(zhì)保期一年,一年內(nèi)產(chǎn)品如有質(zhì)量問(wèn)題,供方負(fù)責(zé)免費(fèi)維修。如果因操作不當(dāng)或者人為損壞,我公司亦應(yīng)提供維修、更換服務(wù),由此產(chǎn)生的費(fèi)用我公司會(huì)酌情收取。
The asphalt concrete slope flow tester conforms to DL / T5362-2006 hydraulic asphalt concrete test regulations. Provided by Shanghai Rongjida Instrument Technology Co Ltd the equipment warranty period is one year. If the product has quality problems within one year, the supplier is responsible for free maintenance. If due to improper operation or man-made damage, our company should also provide repair and replacement services, and the costs incurred by our company will be charged at our discretion.
瀝青混凝土斜坡流淌值試驗(yàn)儀儀器的組成:
★鋼板制成:主機(jī)1臺(tái),可放置6個(gè)試件。
★萬(wàn)用電表1個(gè)。
★位移計(jì):精度0.01mm6個(gè)。
Composition of asphalt concrete slope flow tester instrument:
★ Steel plate: 1 host machine, 6 test pieces can be placed.
★ 1 multimeter.
★ Displacement meter: 6 pcs.
瀝青混凝土斜坡流淌值試驗(yàn)儀試驗(yàn)步驟:
★按規(guī)定制備瀝青混合料,按規(guī)定成型馬歇爾試件,每組6個(gè),高度63.5mm±1.3mm。從現(xiàn)場(chǎng)鉆取的芯樣,應(yīng)加工成直徑為100mm±3mm,高度為63.5mm±1.3mm的試件。
★試件成型后,在室溫條件下放置24h,測(cè)量試件高度。
★采用耐高溫的高強(qiáng)度黏結(jié)劑將每個(gè)試件粘貼的斜坡流淌儀上,在距試件底部50mm處用高強(qiáng)度黏結(jié)劑粘貼8mm×3mm×1mm的銅片,在銅片的一根導(dǎo)線,在流淌儀板面上有一根公用導(dǎo)線:各銅片的導(dǎo)線及公用導(dǎo)線分別與萬(wàn)用表兩 連接,調(diào)整位移計(jì)位置,使位移計(jì)測(cè)頭與銅片接觸,檢驗(yàn)電路是否接通。位移計(jì)距離斜坡面垂直距離50mm。
★將斜坡坡度調(diào)整至設(shè)計(jì)規(guī)定的坡度,如無(wú)規(guī)定,斜坡坡度科采用1:1.7。
★將烘箱升至試驗(yàn)溫度,溫度誤差控制在±1℃。試驗(yàn)溫度可按工程實(shí)際情況確定,如無(wú)規(guī)定,可采用70℃。
★斜坡流淌儀放入烘箱前,調(diào)整位移計(jì),讀取各試件的初讀數(shù)Uo,然后將斜坡流淌儀平穩(wěn)放入已升溫至試驗(yàn)溫度的烘箱內(nèi)。
★恒溫48h,讀取各試件的變形值Ue。
Test steps of asphalt concrete slope flow tester:
★ Asphalt mixture is prepared according to the regulations, and Marshall test pieces are formed according to the regulations, 6 in each group, and the height is 63.5mm ± 1.3mm. Core samples drilled from the site should be processed into test pieces with a diameter of 100mm ± 3mm and a height of 63.5mm ± 1.3mm.
★ After forming the test piece, place it at room temperature for 24h and measure the height of the test piece.
★ Use a high-temperature resistant high-strength adhesive to attach each test piece to the slope flow meter. At a distance of 50mm from the bottom of the test piece, use a high-strength adhesive to paste a 8mm × 3mm × 1mm copper sheet. There is a common wire on the surface of the flow meter: the copper wire and the common wire are respectively connected to the two meters of the multimeter, adjust the position of the displacement meter, make the displacement meter contact the copper plate, and check whether the circuit is connected. The displacement meter is 50mm perpendicular to the slope surface.
★ Adjust the slope of the slope to the slope specified in the design. If there is no stipulation, the slope section will use 1: 1.7.
★ Raise the oven to the test temperature, and the temperature error is controlled at ± 1 ℃. The test temperature can be determined according to the actual situation of the project. If there is no stipulation, 70 ℃ can be used.
★ Before the slope flow meter is placed in the oven, adjust the displacement meter, read the initial reading Uo of each test piece, and then put the slope flow meter into the oven that has warmed up to the test temperature.
★ Constant temperature 48h, read the deformation value Ue of each test piece.
瀝青混凝土斜坡流淌值試驗(yàn)儀試驗(yàn)結(jié)果處理:
★斜坡流淌值按式計(jì)算 至0.01mm
U=Uo-Ue
式中:
U---斜坡流淌值,mm
Uo---初讀數(shù),mm
Ue---恒溫48h時(shí)的讀數(shù),mm
★以每組6個(gè)試件測(cè)值的平均值作為試驗(yàn)結(jié)果,若6個(gè)試件中有1個(gè)
或2個(gè)試件的流淌值與平均值之差超過(guò)10%,則取其余試件的平均值作為試驗(yàn)結(jié)果:如有3個(gè)以上試件的流淌值與平均值之差超過(guò)15%,應(yīng)重新試驗(yàn)。
瀝青混凝土斜坡流淌值試驗(yàn)儀試驗(yàn)完畢后,清理表面,罩好防塵罩
Test results processing of asphalt concrete slope flow tester:
The slope flow value is calculated according to the formula, to 0.01mm
U = Uo-Ue
In the formula:
U --- slope flow value, mm
Uo --- initial reading, mm
Ue --- reading at constant temperature for 48h, mm
Take the average value of 6 test pieces in each group as the test result, if 1 of the 6 test pieces
Or if the difference between the flow value of the 2 test pieces and the average value exceeds 10%, then take the average value of the remaining test pieces as the test result: if the difference between the flow value of 3 or more test pieces and the average value exceeds 15%, the test.
After the asphalt concrete slope flow tester is finished, clean the surface and cover it with a dust cover.